No scheduled disruptions

Limited services between Grantham and Peterborough to enable work on a new tunnel beneath the line at Werrington, north of Peterborough.

Those travelling between Scotland and London may need to make multiple changes, and services between Nottingham and Norwich will be diverted and will not call at Grantham.  Some passengers may need to transfer to rail replacement services for part of their journey.

No Thameslink service to or from St Pancras via Finsbury Park on Sunday 24 January, as the line between St Pancras and London Blackfriars is closed for engineering work.

Limited services between Grantham and Peterborough to enable work on a new tunnel beneath the line at Werrington, north of Peterborough.

Those travelling between Scotland and London may need to make multiple changes, and services between Nottingham and Norwich will be diverted and will not call at Grantham.  Some passengers may need to transfer to rail replacement services for part of their journey.

A reduced service in and out of London King’s Cross while some platforms are closed to enable improvement work to take place.

Services also diverted between Peterborough and Hitchin via Cambridge to enable track renewal to take place, which will extend journey times.

No services to or from London King’s Cross, Moorgate, or to or from St Pancras via Finsbury Park to enable new overhead line structures to be fitted and new signalling equipment to be installed across the King’s Cross area.

A reduced service in and out of London King’s Cross while some platforms are closed to enable improvement work to take place.

Services also diverted between Peterborough and Hitchin via Cambridge to enable track renewal to take place, which will extend journey times.

A reduced service in and out of London King’s Cross while some platforms are closed to enable improvement work to take place.

Services also diverted between Peterborough and Hitchin via Cambridge to enable track renewal to take place, which will extend journey times.

Services diverted between Stevenage and Alexandra Palace via Hertford North, which will extend journey times.

No services to or from London King’s Cross or St Pancras via Finsbury Park.

A temporary reduced timetable will operate on services to and from London King’s Cross while we install the redesigned track layout around the station.

At peak times, such as between 8-9am on weekdays, ten trains per hour will arrive at King’s Cross, two fewer than operate today, but with a reduced impact at less busy times when fewer trains usually run.

No services to or from London King’s Cross.

No services to or from London King’s Cross, Moorgate or St Pancras via Finsbury Park.

A temporary reduced timetable will operate on services to and from London King’s Cross while we install the redesigned track layout around the station.

At peak times, such as between 8-9am on weekdays, ten trains per hour will arrive at King’s Cross, two fewer than operate today, but with a reduced impact at less busy times when fewer trains usually run.

No services to or from London King’s Cross or St Pancras via Finsbury Park from the early afternoon.

No services between Stamford and Peterborough, while work is carried out on the new tunnel at Werrington, north of Peterborough. Many passengers will need to transfer to rail replacement services for part of their journey.

No services to or from London King’s Cross or St Pancras via Finsbury Park.

No services between Grantham and Peterborough on the East coast Main Line and between Stamford and Peterborough, while work is carried out on the new tunnel at Werrington, north of Peterborough. Many passengers will need to transfer to rail replacement services for part of their journey.